Summary
- This series consists of 3 volumes of measurements, calculations, and estimates for construction of the Chenango Canal. For each survey station (approximately three chains apart), there are calculations of cubic footage of excavation, embankment (towpath, berme, etc.), and lining, with comments and totals. For each section of the canal there is an abstract of the account for that section, listing work done, extra material used, pay rate, total amount due, date, and contractor's name.
Title
- Measurements, calculations, and estimates for construction of Chenango Canal
Quantity
- 1 cubic foot; 3 volumes
Inclusive Dates
Series Number
- A1091
Creator
Scope and Content Note
This series consists of three volumes of measurements, calculations, and estimates for construction of the Chenango Canal.
For each survey station (approximately three chains apart) there are calculations of cubic footage of excavation, embankment (towpath, berme, etc.), and lining, with comments and totals. For each section of the canal there is an abstract of the account for that section, listing work done, extra material used, pay rate, total amount due, date, and contractor's name. There are also special calculations for canal feeders, locks, culverts, aqueducts, dams, fences, waste water weirs, etc., including detailed figures for amount and value of stone and wood work and drawings of locks, culverts, and other works.
Volume 1 covers sections 5-26 (Hamilton-Norwich); volume 2, sections 27-47 (Norwich-Greene); volume 3, sections 48-68 (Greene-Binghamton). Volume 1 contains the signature of Alfred Barrett, engineer. There is no indication of why these volumes came into the possession of the comptroller, but it was presumably because he paid the bills for construction of the canal.
Access Restrictions
There are no restrictions regarding access to or use of this material.